Florida SIRS Explained: The Structural Integrity Reserve Study Your Condo Cannot Skip

Florida's Structural Integrity Reserve Study — almost always shortened to SIRS — is the single biggest reason condo fees across the state have jumped since 2023. It is not a board initiative, a management-company upsell or a new tax. It is a statutory study, created after the Surfside collapse, that forces associations to inspect their buildings' structural systems, price their eventual replacement, and actually collect the money. This guide explains what the study is, which buildings must have one, what it must contain, and how it reaches your monthly fee.
What a SIRS Is, in One Paragraph
Under Florida Statute § 718.112(2)(g), every condominium association must complete a structural integrity reserve study at least every 10 years for each building on the property that is three habitable stories or higher. Cooperatives carry the parallel duty under § 719.106(1)(k). The study is based on a visual inspection of the building, must be performed or verified by a licensed engineer, a licensed architect, or a person certified as a reserve specialist (RS) or professional reserve analyst (PRA), and it converts the building's physical condition into a mandatory savings plan.
Two phrases in the statute do heavy lifting. "Habitable stories" — clarified by HB 913 (2025) — counts floors people live in; floors used exclusively for parking, storage or mechanical equipment do not count toward the three-story threshold. And the study is not advisory: once it exists, the association's budget must follow its funding plan for the components it covers.

The Components a SIRS Must Cover
The statute names the component groups. For each one, the study must state the estimated remaining useful life and the estimated replacement cost or deferred maintenance expense:
| Component | What the Study Examines | Why It Matters |
|---|---|---|
| Roof | Covering, membrane, drainage and remaining life | The largest single replacement most buildings face |
| Structure | Load-bearing walls, columns, beams, slabs, floor and foundation systems | The Surfside lesson: deterioration here is life-safety, not cosmetics |
| Fireproofing & Fire Protection | Fire-rated assemblies, sprinklers and protection systems | Code compliance and insurability |
| Plumbing | Building-wide supply, drain and waste systems | Aging cast-iron stacks are a common six-figure surprise |
| Electrical Systems | Panels, distribution and common-area systems | Capacity and safety in older buildings |
| Waterproofing & Exterior Painting | Envelope coatings, balcony waterproofing, paint systems | Florida's salt air and storms attack the envelope continuously |
| Windows & Exterior Doors | Common-area windows and exterior doors | Wind-borne debris codes drive replacement cost |
| Catch-All Items | Any other item over $25,000 whose failure would affect the above | Catches elevators, garages and pumps the list misses |
The catch-all threshold was $10,000 until HB 913 raised it to $25,000 effective July 1, 2025; the Division of Florida Condominiums adjusts it for inflation, and lists the 2026 figure as $25,675. If an item crosses the threshold and its failure would negatively affect a named component, it belongs in the study.
How a SIRS Differs From an Ordinary Reserve Study
Associations have commissioned reserve studies for decades, and Florida owners historically could vote to waive or reduce reserve funding — one reason so many buildings entered the 2020s with empty reserve accounts. A SIRS removes that option for the components it covers. For budgets adopted on or after December 31, 2024, the members of a unit-owner-controlled association that must obtain a SIRS may not vote to provide no reserves, or less reserves than the statute requires, for SIRS items. The study must include at least a baseline funding plan — a plan under which the reserve balance for SIRS items never falls below zero in any year of the projection.
HB 913 added flexibility in how the money is raised, not whether it is raised: SIRS reserves may be funded through regular assessments, special assessments, lines of credit or loans, and the study must reflect the funding method the association selects. An association that has just completed a milestone inspection may also, with majority owner approval, pause SIRS funding for up to two consecutive budget years to pay for milestone-driven repairs. Our SIRS deadline guide walks through those dates.
Wondering What SIRS Funding Does to a Monthly Fee Over 10 or 20 Years?
Use Our Free HOA Calculator →What Happens After the Study Is Delivered
Within 45 days of receiving the completed study, the association must give every unit owner a copy of the study or a notice that it is complete and available, and must file a statement with the Division of Florida Condominiums, Timeshares, and Mobile Homes (part of DBPR) confirming completion, using the Division's form and online account. The study then drives the budget: the board adopts assessments consistent with the funding plan, and owners see the result as higher monthly fees, a special assessment, or both. If your building's number has already landed, our guides to HOA fees in Florida and to a special assessment you can't afford cover the payment-plan and hardship options.

SIRS vs. Milestone Inspection: Not the Same Thing
The two post-Surfside duties are often confused. The milestone inspection (§ 553.899) is a structural safety inspection by a licensed engineer or architect, due by December 31 of the year a building turns 30 (sooner near the coast where the local enforcement agency requires it), and repeated every 10 years; it answers "is this building safe?" The SIRS answers "what will it cost to keep it that way, and are we saving for it?" A building can pass its milestone inspection and still face steep SIRS-driven fee increases — the inspection finds the condition, the study prices it.
Sources: Fla. Stat. §§ 718.112(2)(f)–(g), 719.106(1)(k), 553.899 (2026 ed.); HB 913, ch. 2025-175, Laws of Fla.; Florida DBPR, Division of Florida Condominiums — SIRS reporting and the 2026 threshold figure. This article is general information, not legal advice.
Frequently Asked Questions
SIRS stands for Structural Integrity Reserve Study. It is a Florida-required study of a condominium or cooperative building's major structural components — their condition, remaining useful life and replacement cost — together with a funding plan the association must follow. It is required by Fla. Stat. § 718.112(2)(g) for condominiums and § 719.106(1)(k) for cooperatives.
📊 Calculate Your HOA Costs
Use our free HOA Fee Calculator to estimate your true lifetime HOA expenses — with year-by-year breakdown.
Calculate Now →Related Insights & Guides
Mehr Farooq, Editor
HOAFeeCalculator.com is an independent educational website edited by Mehr Farooq. Its state fee figures come from U.S. Census Bureau and FCAR data — see our methodology page for the full sources and method.